The Preliminary Feasibility Study (Study), entitled "S-K 1300 Preliminary Feasibility & Technical Report Summary, Santa Cruz Copper Project, Arizona," is dated June 23, 2025, and was prepared in accordance with Subpart 1300 and Item 601 of Regulation S-K. The Study was prepared by the following firms: Fluor Canada Ltd. (Fluor), BBA USA Inc. (BBA), KCB Consultants Ltd. (KCB), Met Engineering, LLC (Met), INTERA Incorporated (INTERA), Burns & McDonnell Engineering Company, Inc. (Burns & McDonnell), Geosyntec Consultants, Inc. (Geosyntec), Haley & Aldrich, Inc. (Haley & Aldrich), Life Cycle Geo, LLC (Life Cycle Geo), Paterson & Cooke USA, Ltd. (Paterson & Cooke), Stantec Consulting Services Inc. (Stantec) and Tetra Tech, Inc. (Tetra Tech).
The Study is available on the SEC's EDGAR website as an exhibit to the Current Report on Form 8-K filed by Ivanhoe Electric with the SEC on June 23, 2025. As disclosed on the Form 8-K filed by Ivanhoe Electric with the SEC on May 11, 2026, the Study is being revised to incorporate the use of the Tunnel Boring Machine and is expected to be completed in the third quarter of 2026.
Ivanhoe Electric has also prepared and filed an independent technical report prepared under Canadian National Instrument 43-101 within 45 days of the June 23, 2025 news release. This report is available
on Ivanhoe Electric's website and on its SEDAR+ profile.
For the purposes of Canadian National Instrument 43-101, the independent Qualified Persons responsible for preparing the scientific and technical information disclosed in this Presentation regarding the Study are Todd McCracken, Shane Ghouralal, and David Willock (BBA), Ulises Arvayo (Burns & McDonnell), Subhamoy Dasgupta and Ivan Sanchez (Fluor), Kirk Craig (Geosyntec), Rick Frechette (Haley & Aldrich), Annelia Tinklenberg (INTERA), Jim Casey (KCB), Tom Meuzelaar (Life Cycle Geo), James Moore (Met), Casey Schmitt (Paterson & Cooke), Kim Trapani (Stantec), and Daryl Longwell (Tetra Tech). Each Qualified Person has reviewed and approved the information in this Presentation relevant to the portion of the scientific and technical information for which they are responsible.
Other disclosures of a scientific or technical nature included in this Presentation regarding the Santa Cruz Copper Project, have been reviewed, verified, and approved by Glen Kuntz, P.Geo., who is a Qualified Person as defined by Regulation S-K, Subpart 1300 promulgated by the U.S. Securities and Exchange Commission and by Canadian National Instrument 43-101. Mr. Kuntz is an employee of Ivanhoe Electric.
The Study and 43-101 technical report include relevant information regarding the assumptions, parameters and methods of the mineral resource and mineral reserve estimates on the Santa Cruz Copper Project, as well as information regarding data verification, exploration procedures and other matters relevant to the scientific and technical disclosure contained in this Presentation. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
Disclosures of a scientific or technical nature included in this Presentation pertaining to the Maaden Joint Venture in Saudi Arabia have been reviewed, verified and approved by Charles N. Forster, P.Geo., who is a Qualified Person as defined by Regulation S-K, Subpart 1300 promulgated by the U.S. Securities and Exchange Commission and by Canadian National Instrument 43-101. Mr. Forster is a Senior Advisor to Ivanhoe Electric.
Disclosures of a scientific or technical nature included in this Presentation pertaining to Tintic and Hog Heaven Projects in the USA have been reviewed, verified and approved by Shawn Vandekerkhove, P.Geo., who is a Qualified Person as defined by Regulation S-K, Subpart 1300 promulgated by the SEC and by Canadian National Instrument 43-101. Mr. Vandekerkhove is Director, New Opportunities of Ivanhoe Electric.
3
Premier U.S.-based Exploration & Development Company Focused on Critical Minerals
Advanced-Stage Santa Cruz Copper Project in Arizona
Technology-Driven Exploration Platform
Exploration Partnerships with Leading Global Mining Companies
Dynamic Portfolio of Exploration Projects in U.S.
Experienced Leadership with Proven Track Record
Strong Balance Sheet & Liquidity to Advance Projects
4
ROBERT FRIEDLAND
Founder and Executive Chairman
TAYLOR MELVIN
President and Chief Executive Officer
QUENTIN MARKIN
EVP, Business Development and Strategy Execution
JORDAN NEESER
Chief Financial Officer
CASSANDRA JOSEPH
General Counsel and Corporate Secretary
GLEN KUNTZ
SVP, Mine Development
GRAHAM BOYD
SVP, Exploration
LEE SAMPSON
VP, Geophysics
MIKE PATTERSON
VP, Investor Relations & Business Development
LARA SIMS
VP, Health & Safety
5
PUBLIC MARKET OVERVIEW
Significant Institutional and Insider Ownership
Primary U.S. Listing: NYSE AMERICAN ("IE")
Shares Outstanding: 158 MILLION
Market Capitalization at May 11: $2.4 BILLION
ANALYST COVERAGE
Cash and Equivalents at March 31: $290 MILLION
BMO Capital Markets Andrew Mikitchook Jefferies Christopher LaFemina,
Patricia Hove
Raymond James Judith Elliott
Scotiabank Orest Wowkodaw
Other 36.4%
Founder and Insiders 8.2%
BlackRock 8.8%
T. Rowe 8.0%
Maaden 7.5%
Fidelity
7.4%
Century Vision 6.5%
Alyeska
4.8%
J.P. Morgan Bill Peterson
Cantor Fitzgerald Puneet Singh
SailingStone 2.4%
Global X 2.5%
6
Vanguard 3.2%
State Street
4.2%
National Bank Financial Andrew Dusome
Ownership source: Bloomberg, FactSet, Company Filings, May 1, 2026. Institutional ownership shown on an aggregated basis by common parent or investment advisor; individual affiliated funds/entities may report separately.
SANTA CRUZ COPPER PROJECT
Advanced, High-Grade Copper Project on Private Land in Arizona
Low Projected Capital Intensity and Operating Costs Advanced Development Timetable
SANTA CRUZ COPPER PROJECT
DISRUPTIVE TECHNOLOGIES
Typhoon Geophysical Surveying System
Computational Geosciences Inc. ("CGI") Data
Inversion Software
VRB USA - Grid-scale Vanadium Redox Flow Batteries
MINERAL EXPLORATION ASSETS
U.S. Portfolio Focused on Critical Metals Exploration 50/50 Joint Venture with Maaden in Saudi Arabia 50/50 Alliance with BHP in Southwest U.S.
50/50 Collaboration with SQM in Chile
DISRUPTIVE TECHNOLOGIES
MINERAL EXPLORATION ASSETS
7
1
SANTA CRUZ COPPER PROJECT
High-Grade, Advanced U.S. Copper Project Designed to Produce Copper Cathode
SANTA CRUZ COPPER RESOURCES
2
Existing Mineral Resources
Provide Expansion Potential
DISRUPTIVE TECHNOLOGIES
Typhoon and CGI Software Unlocking New Opportunities
MINERAL EXPLORATION
U.S. Exploration Assets and Partnerships with Leading Mining Companies Provide Global Opportunities for New Discoveries
8
9
10
Low Initial Capital and Operating Costs
Summary Economics at $4.25/pound Copper
Modern Underground Mine @ ~20,000 Tonnes per Day
On-off Heap Leach Process with High
Copper Recoveries
SX/EW Process to Produce 99.99% Pure Copper cathode onsite
High-grade Mineral Reserves: ~1.5
Million Tonnes Contained Cu @ 1.08%
Significant Leverage to Higher Copper Prices
1Results presented of the 2025 Preliminary Feasibility Study published under U.S. S-K 1300 on June 23, 2025, which is being updated to incorporate use of the Tunnel Boring Machine (see Form 8-K filed on May 11, 2026). The NI 43-101 Technical Report co-filed in Canada included the Study as a Feasibility Study as defined by the Canadian Institute of Mining, Metallurgy and Petroleum; 22024 cash operating costs on a co-product basis for global copper mines, excluding processing facilities as defined by S&P Global Market Intelligence; 3Initial capital expenditures per average tonne of annual paid copper produced during first 15 years of mining; 4Payback period post-construction.
$1.24B
INITIAL CAPITAL EXPENDITURES
$1.32
PER POUND UNIT CASH OPERATING COSTS2
~92%
LIFE OF MINE AVERAGE COPPER RECOVERIES
$17.2
k/tonne
CAPITAL INTENSITY3
$1.4B
AFTER-TAX NPV8%
20.0%
AFTER-TAX IRR
~72kt
1st 15-YEARS' AVERAGE COPPER PRODUCTION
23 Years
MINE LIFE
$240M
AFTER-TAX NPV PER
$0.25/LB CHANGE IN Cu
~1.4MT
LIFE-OF-MINE
COPPER PRODUCTION
$5.0B
LIFE-OF-MINE AFTER-TAX FREE CASHFLOW
4.4 Years
AFTER-TAX PAYBACK PERIOD4
11
12
1Inclusive of Reserves. 13
The Robbins Company is a US-based Leader in Tunnel Boring Industry
~ 70 Years of Innovation and Experience with Over 1,000 Projects Completed Globally
Crossover TBM Has Specialized Cutterhead and Advanced Drive System
Transitions Between Mixed-face, Wet and Hard Rock Ground Conditions in Single Drive
Earth Pressure Balance Capabilities
Mitigate Water Inflow
14
15
Permitting
Timeline Subject to Receipt of Permits and Project Financing
First Copper Cathode
Construction & Development
2026 2027 2028 2029
16
1.5 Million Tonnes of Contained Copper in Indicated Resources2
Includes ~0.5 million tonnes of primary sulfides at Santa Cruz Deposit, providing near-mine expansion potential
3.3 Million Tonnes of Contained Copper in Inferred Resources2
Includes ~2.7 million tonnes at Texaco Deposit
East Ridge
Santa Cruz
Texaco
Inferred Resource Domain
Oxide Chalcocite Primary
1Inclusive of Reserves. 2Exclusive of Reserves. 17
~$5001 Million of Liquidity Added Since September 2025 to Fund Early Project Construction
Advanced Project Financing Process
U.S. Export-Import Bank Letter of Interest for $825 Million Received in April 2025
Advancing through full application process
Strong Interest from Commercial Banks
Secured $200 million bank credit facility in December 2025
Group of banks fully engaged in project due diligence including independent engineer
review
Targeting Completion of Project Financing Commitments in 2026
1Includes proceeds from warrant exercise and pro forma estimated after-tax proceeds from sale of stake in non-core asset. 18
19
TyphoonTM
TYPHOON GEOPHYSICAL SURVEY
TECHNOLOGY
High power and clean signal enables larger and deeper surveys
Able to detect the presence of sulfide mineralization to depths of over 1.5 kilometers
Effectively accelerates the exploration process
COMPUTATIONAL GEOSCIENCES INC. DATA INVERSION SOFTWARE
Industry-leading algorithms for 3D subsurface modeling, and optimized inversions for Typhoon data
Powerful machine-learning software capable of generating rapid inversions (~1 day)
Guides real-time decision-making in field
20
Disclaimer
Ivanhoe Electric Inc. published this content on May 15, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on May 15, 2026 at 12:35 UTC.