FLNC
Published on 07/08/2025 at 01:20
Fluence Energy, Inc. announced that the company has been selected by AMPYR Australia (AMPYR) for the 300 MW /600 MWh Wellington Stage 1 Battery Energy Storage System (BESS) in Wellington, New South Wales, Australia. AMPYR has contracted Fluence for construction of this project and a 20-year service and maintenance contract. The project will also be powered by Fluence's Mosaic bidding software and Nispera asset performance management software.
The Wellington Stage 1 BESS is AMPYR's first grid-scale battery energy storage system to reach financial close in Australia. This project is scheduled to be energised in 2026, signaling a significant step towards bolstering Australia's renewable energy capacity and grid stability. Wellington Stage 1 will use Fluence's Gridstack??
grid-scale energy storage product, underpinned by Fluence's multi-generational technology platform. The system will be optimized by Mosaic, Fluence's intelligent, AI-powered bidding software, designed to enhance the efficiency and profitability of BESS in the National Electric Market (NEM) and Nispera, Fluence's next generation asset performance management software. Mosaic will be used to manage AMPYR's virtual tolling contract, which will allow AMPYR to nominate when the battery should charge or discharge, to maximize performance.