NPWR
Published on 05/11/2026 at 04:58 pm EDT
First Quarter 2026 Earnings Presentation
Clean independent power producer with deep domain knowledge in power generation with carbon capture integration, utilizing in-house engineering capabilities to maximize project returns
Clean. Firm. Scalable.
Transforming natural gas into the lowest cost form of clean firm power
Strategic partners possess industry-leading expertise in all things CO2: post-combustion carbon capture technology, transportation, enhanced oil recovery and regulatory
Unique 100% focus on catalyzing clean firm power developments
3
Progressing interconnected workstreams across power offtake, detailed engineering and project finance to maintain schedule for Project Permian Phase I and catalyze subsequent developments
Power offtake Detailed engineering
Net Power has engaged a strategic advisor to aid in securing long-term power offtake for Project Permian Phase I and future larger scale deployments in the Permian
Project Permian
Advancing detailed design, down-selecting EPCs, progressing work with independent engineer for Project Permian Phase I; ensuring capability to rapidly scale to 800MW on existing Permian site
Project financing
4
Power offtake agreement is the first step in converting Permian Phase I and future phases into actionable, financeable developments
Net Power's flexible deployment offering provides speed to power and rapid scalability
First Deployment 80MW
Second Deployment
Flexible to customer needs
Third Deployment
Flexible to customer needs
Offtake structure
Fixed-price long-term VPPA ($/MWh) or co-location
Fixed-price long-term VPPA or co-location ($/MWh)
Fixed-price long-term VPPA or co-location ($/MWh)
Power delivery
Grid delivery (via Oncor/ERCOT interconnect) or behind the meter
Grid delivery or behind the meter
Grid delivery or behind the meter
Sequestration
Via Oxy EOR infrastructure
Via Oxy EOR infrastructure
Via Oxy EOR infrastructure
Location
Power gen site on Oxy-leased land;
~800MW data center co-location buildout possible
Flexible within the Permian Basin
Flexible within the Permian Basin
Net Power is actively progressing conversations with prospective offtakers through strategic advisory engagement
5
Project Permian Phase I driving towards achieving first operational natural gas + carbon capture and sequestration (CCS) project in the United States; significant scale up opportunity on existing site
Power generation: natural gas combined cycle
Carbon capture: Entropy post-combustion carbon capture (PCC) technology
Power delivery: grid connected 80MW
CO2: indicative terms with Oxy for 100% of CO2offtake
Power: marketing to offtakers
FID: 2H 2026
COD: 1H 2029
Prelim 80MW clean power product configuration
Potential for 10x scale up (800 MW) on existing Net Power Permian site
5 6
1 2 3 4
7 8 9 10
Q2 2026: Entropy Glacier Phase 2 validation of PCC tech utilizing gas turbines
2H 2026: Target FID for first 80MW deployment in Permian
2H 2027: Target construction start for first 80MW deployment
Early 2029: target COD for first 80MW Net Power deployment in Permian
6
All factors may vary by site-specific conditions and operating decisions. Site-specific factors include elevation and ISO temperature.
~5x scaling
~2-3x scaling
Project Permian is the next step in the evolution of Entropy's PCC technology
Glacier Phase 1
Glacier Phase 2
Project Permian
Carbon Capture Sizing
30 ktpa,
from gas compressors
160 ktpa,
from gas compressors & turbines
380 ktpa,
from gas turbines
Power Sizing
N/A
15 MW Turbine
2 x 35 MW Turbine
Project Status
3+ years successful run-time and operational knowhow
Construction nearing completion,
June 2026 COD
FEED stage
2029 COD
Configuration
Reciprocating engines (recips)
CO2
2x amine towers
Amine
1x regen tower
10 x recips +
1 x 15 MW turbine (Solar T130)
CO2
2x amine towers (16ft round x 220ft)
Amine
12 ft regen tower
2 x 35 MW
turbines
CO2
2x amine towers (18ft square x 150 ft)
Amine
16ft regen tower
Technology Readiness Level
TRL 9
Demonstrated capture system at first commercial scale
TRL 8-9
Validates integrated gas + CCS system performance at scale
TRL: 8-9
Direct scale-up of proven design to larger capacity
Sources: Entropy corporate materials 7
Disclaimer
Net Power Inc. published this content on May 11, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on May 11, 2026 at 20:49 UTC.