Whitehaven Coal : MCC - EPL Monitoring Summary August 2021

WHC.AX

`

MAULES CREEK COAL MINE - MONTHLY MONITORING SUMMARY

Site Information

EPL No: 20221

EPA Website Link: Hyperlink to Maules Creek Coal, Environment Protection Licence

Licensee: Maules Creek Coal Mine Pty Ltd

Licensee Address: Maules Creek Coal Mine, Therribri Road, BOGGABRI NSW 2382

EPL Monitoring Points: See Figure 1 below

Sampling Period: August 2021

Obtained Date: 22 September 2021

Publication Date: 22 September 2021

Context: This Monthly Monitoring Summary aligns with the Environment Protection Licence (EPL) No. 20221 - Maules Creek Coal Mine issued 7th March 2018 by the NSW Environment Protection Authority (EPA).

Monthly Monitoring Summary

Table 1 - Wet Weather Discharge - Surface Water Monitoring

ID

Laboratory

Median

Max /

Parameter

Units

Frequency Samples

Date

Results

Min

Mean

Only

EPL (Site)

Value

Received

Value

TSS

mg/L

Special

3

Conductivity

µs/cm

Frequency

(SD3)

Oil & Grease

mg/L

Discharge

pH

pH

only

TSS

mg/L

Special

7

Conductivity

µs/cm

Frequency

(SD7)

Oil & Grease

mg/L

Discharge

pH

pH

only

No Discharge this month

TSS

mg/L

Special

9

Conductivity

µs/cm

Frequency

(SD9)

Oil & Grease

mg/L

Discharge

pH

pH

only

TSS

mg/L

Special

36

Conductivity

µs/cm

Frequency

(SD12)

Oil & Grease

mg/L

Discharge

pH

pH

only

Table 2 - Surface Water Monitoring - Mine Void

ID

Parameter

Units

Frequency

Samples

Date

Laboratory Results

Min

Mean

Max /

EPL (Site)

Received

Only Value

TSS

mg/L

0

12

Conductivity

µs/cm

Every 2

0

Next Sample

(Mine Void)

Oil & Grease

mg/L

months

0

September 2021

pH

pH

0

Table 3 - Groundwater Quality Monitoring

ID

Laboratory

Parameters

Units

Frequency

Samples

Date

Results

Min

Mean

Max / Only Value

EPL (Bore)

Received

15

pH

pH

Conductivity

µs/cm

Quarterly

0

Next sample in September 2021

(BCM01)

TDS

mg/L

16

pH

pH

Conductivity

µs/cm

Quarterly

0

Next sample in September 2021

(BCM03)

TDS

mg/L

17

pH

pH

Conductivity

µs/cm

Quarterly

0

Next sample in September 2021

(REG10A)

TDS

mg/L

24

pH

pH

Conductivity

µs/cm

Quarterly

0

Next sample in September 2021

(RB05A)

TDS

mg/L

Table 4 - Noise Monitoring (Attended - Measured)

Limit LAeq

Limit

MCCP

LA1 (1 min)

15min (dB)

MCCP

Start

Wind Speed

LAeq 15min

(dB)

Exceedance

MCC ID

Date

L A1(1min)

Rain (mm)

Time

(m/s)

dB

(Yes / No)

Operations

dB

Operations

Criteria

Criteria

NM1

03/08/2021

22:30

0.1

27

35

30

45

0

Nil

NM2

03/08/2021

23:30

2.1

IA

39

IA

45

0

Nil

NM3

03/08/2021

23:45

2.8

IA

35

IA

45

0

Nil

NM4

03/08/2021

23:00

0.2

IA

35

IA

45

0

Nil

NM5

03/08/2021

22:00

0.2

25

35

30

45

0

Nil

NM6

03/08/2021

23:56

2.4

IA

35

IA

45

0

Nil

MCC ID = Locations as per the EPL No.20221.

ND = No data due to high prevailing winds during the attended noise monitoring event.

Italicised text indicates wind speed exceeds the 3.0m/s maximum for noise monitoring.

NM = Not Measurable. If site noise is noted as NM, <20 dB or <30 dB some noise was audible but could not be quantified.

IA = Site noise was inaudible at the monitoring location.

N/A in exceedance column means criterion was not applicable due to atmospheric conditions outside those specified in the project approval.

Table 5 - Noise Monitoring (Attended - Low Frequency Assessment)

None of the measurements satisfied the conditions for further assessment when assessed for the applicability of low frequency modification factors in accordance with the EPA's Noise Policy for Industry. Therefore, no further assessment of low frequency noise was required to be undertaken.

Table 6 - Blast Monitoring (Blasts - Limits Apply)

Location

Parameter

Units

Frequency

Number

Average

Max

100% Limit

Exceedance

(Yes / No)

Operations

Overpressure

Db (Lin Peak)

All

8

95.72

111.0

120

No

Blasts

Vibration

mm/s

8

0.32

2.78

10

No

Note: As of March 2018, in accordance with the requirements of the approved variation of EPL 20221; M7.1 blast monitoring results are for four blast monitoring points 31 (BM1), 32 (BM2), 33 (BM3) and 34 (BM4).

Table 7 - Dust Monitoring (Limits Apply)

ID

Sample

Rolling

NEPM

Exceedance

Unit

Parameter

Annual

Annual

EPL (Site)

period

(Yes / No)

Average

Criteria

18

Continuous

µg/m3

PM10

7.9

30

No

(TEOM1)

month

19

6 days

µg/m3

PM10

11.9

30

No

(HVAS)

Rolling

ID

Sample

Particulates

Annual

Exceedance

Deposited

Average

Criteria

EPL (Site)

period

(Yes / No)

Matter

Insoluble

Solids

20

Monthly

g/m2 month

2.4

4

No

(DDG1/MC1)

21

Monthly

g/m2 month

2.2

4

No

(DDG2/MC2)

22

Monthly

g/m2 month

1.8

4

No

(DDG3/MC3)

23

Monthly

g/m2 month

1.3

4

No

(DDG4/MC4)

This is an excerpt of the original content. To continue reading it, access the original document here.

Disclaimer

Whitehaven Coal Limited published this content on 22 September 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 22 September 2021 07:11:02 UTC.