AU
Published on 05/08/2026 at 06:03 am EDT
N Y S E │ J S E │ G S E
0 8 M A Y 2 0 2 6
M I N I N G T O E M P O W E R P E O P L E A N D A D V A N C E S O C I E T I E S
Nevada, United States
MINERAL RESOURCE AND MINERAL RESERVE INFORMATION
The Mineral Resource and Mineral Reserve stated herein were prepared in compliance with Subpart 1300 of Regulation S-K (17 CFR § 229.1300) ("Regulation S-K 1300"). Refer to Item 1300 (Definitions) of Regulation S-K for the meaning of the terms used in AngloGold Ashanti's Mineral Resource and Mineral Reserve reporting. The Mineral Resource and Mineral Reserve represent the amount of gold, copper, silver, sulphur and molybdenum estimated at 31 December 2025 and are based on information available at the time of estimation. Such estimates are, or will be, to a large extent, based on the prices of the respective commodities and interpretations of geologic data obtained from drill holes and other exploration techniques, which data may not necessarily be indicative of future results. The Mineral Resource and Mineral Reserve estimates are published at 31 December 2025, taking into account economic assumptions, changes to future production and capital costs, depletion, additions as well as any acquisitions or disposals during 2025. The legal tenure of each material property has been verified to the satisfaction of the accountable Qualified Person and all of the Mineral Reserve has been confirmed to be covered by the required mining permits or there exists a realistic expectation, based on applicable laws and regulations, that issuance of permits or resolution of legal issues necessary for mining and processing at a particular deposit will be accomplished in the ordinary course and in a timeframe consistent with AngloGold Ashanti's (or its joint venture partners') current mine plans. For the Mineral Reserve, the term "economically viable" means that profitable extraction or production has been established or analytically demonstrated in, at a minimum, a pre-feasibility study, to be economically viable under reasonable investment and market assumptions. Mineral Reserve is subdivided and reported, in order of increasing geoscientific knowledge and confidence, into Probable and Proven Mineral Reserve categories. Mineral Reserve is aggregated from the Probable and Proven Mineral Reserve categories. Ounces of gold or silver or pounds of copper or sulphur included in the Probable and Proven Mineral Reserve are estimated and reported as delivered to plant (i.e., the point where material is delivered to the processing facility) and exclude losses during metallurgical treatment. In compliance with Regulation S-K 1300, the Mineral Resource herein is reported as exclusive of the Mineral Reserve before dilution and other factors are applied, unless otherwise stated. Mineral Resource is subdivided and reported, in order of increasing geoscientific knowledge and confidence, into Inferred, Indicated and Measured Mineral Resource categories. Ounces of gold or silver or pounds of copper, sulphur or molybdenum included in the Inferred, Indicated and Measured Mineral Resource are those contained in situ prior to losses during extraction and processing. While it would be reasonable to expect that the majority of Inferred Mineral Resource would upgrade to Indicated Mineral Resource with continued exploration, due to the uncertainty of Inferred Mineral Resource, it should not be assumed that such upgrading will always occur.
If estimations must be revised due to significantly lower commodity prices, increases in operating costs, reductions in metallurgical recovery or other factors, the Mineral Resource or Mineral Reserve may not be mined or processed profitably. In addition, material write-downs of AngloGold Ashanti's investment in its mining properties may be required, including impacts on goodwill, as well as increased amortisation, reclamation and closure charges. If AngloGold Ashanti determines that certain parts of its Mineral Resource or Mineral Reserve have become uneconomic, this may ultimately lead to a reduction in its reported aggregate Mineral Resource or Mineral Reserve, respectively. Consequently, if AngloGold Ashanti's actual Mineral Resource and Mineral Reserve is less than current estimates, its business, prospects, results of operations and financial position may be materially impaired.
Pre-feasibility and feasibility studies for undeveloped ore bodies present estimated capital expenditure and operating costs based on anticipated tonnage and grades of ore to be mined and processed. Other factors underlying the estimations include, among others, the predicted configuration of the ore body, anticipated metal recovery rates, and estimated costs of operating and processing equipment and facilities. Actual operating and capital expenditure cost and economic returns on projects may differ significantly from original estimates. Further, it may take many years from the initial phases of exploration until commencement of production, during which time, the economic feasibility of production may change. The Mineral Resource is subject to further exploration and development, and is subject to additional risks, and no assurance can be given that they will eventually convert to Mineral Reserve.
For additional information, refer to Table 1 (Summary Mineral Resource) and Table 2 (Summary Mineral Reserve) to Paragraph (b) of Item 1303 (Summary disclosure) of Regulation S-K, as presented in AngloGold Ashanti's annual report on Form 20-F for the financial year ended 31 December 2025, filed with the SEC on 26 March 2026. These summary tables include each class of Mineral Resource (Inferred, Indicated and Measured) together with total Measured and Indicated Mineral Resource, and each class of Mineral Reserve (Probable and Proven) together with total Mineral Reserve. The Mineral Resource at the end of the financial year ended 31 December 2025 was estimated using a gold price of $2,000/oz (2024: $1,900/oz), a copper price of $3.50/lb (2024: $3.50/lb), a silver price of $23.00/oz (2024: $23.00/oz) and a molybdenum price of $12.00/lb (2024: $12.00/lb), unless otherwise stated. The Mineral Reserve at the end of the financial year ended 31 December 2025 was estimated using a gold price of $1,700/oz (2024: $1,600/oz), a copper price of $3.10/lb (2024: $2.90/lb) and a silver price of $19.50/oz (2024: $19.50/oz), unless otherwise stated.
The scientific and technical information in respect of AngloGold Ashanti's Mineral Resource and Mineral Reserve for the financial year ended 31 December 2025, contained in this document has been reviewed and approved for release by Mrs. TM Flitton, Chairperson of AngloGold Ashanti's Mineral Resource and Mineral Reserve Leadership Team, Vice President Resource and Reserve, Master of Engineering (Mining), Bachelor of Science (Honours, Geology), SME RM, Pr.Sci.Nat (SACNASP), FGSSA. Mrs. TM Flitton assumes responsibility for the Mineral Resource and Mineral Reserve processes for AngloGold Ashanti. Mrs. TM Flitton has 24 years' experience in mining with 13 years directly leading and managing Mineral Resource and Mineral Reserve reporting. She is employed full-time by AngloGold Ashanti and can be contacted at the following address: 6363 S. Fiddlers Green Circle, Suite 1000, Greenwood Village, CO 80111, United States. Mrs. TM Flitton consents to the inclusion of the Mineral Resource and Mineral Reserve information in this document, in the form and context in which it appears in the narrative disclosure.
SAFETY │OUR HIGHEST PRIORITY
our operations.
R E C O R D P E R F O R M A N C E A C H I E V E D
Total Recordable Injury Frequency Rate*
-81%
ICMM 2024 member companies avg. 2.29
0.86
Injuries per million hours worked 5.0
4.0
3.0
2.0
1.0
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
TRIFR
Q1 2026
*TRIFR: Total Recordable Injury Frequency Rate (excludes non-managed joint ventures)
Q1 2026 HIGHLIGHTS │ STRONG START TO THE YEAR
S T R O N G O P E R A T I O N A L A N D F I N A N C I A L P E R F O R M A N C E
Market-driven factors driving cost increases
OPERATIONAL
DELIVERY
$
COST MANAGEMENT
Group total
cash costs*
$1,391/oz**
y-o-y increase ▲ 14%
Managed operations**
y-o-y increase ▲ 14%
Robust balance sheet underpinned by strong liquidity
c.$4.6bn
▲Strong liquidity
CASH FLOW
AND EARNINGS
BALANCE SHEET
AND CAPITAL
ALLOCATION
$868m
▲Net cash*
(2025 Q1: Net debt* $755m)
$1.16/sh 2026
▲Dividends declared
c.$585m 2026 Q1
$467m
▲ 39% Group capital
expenditure
(2025 Q1: $336m)
Improved fundamentals supporting performance
Geita ▲ 12koz
724koz
Cuiabá ▲ 9koz Obuasi ▲ 8koz Iduapriem ▲ 4koz
▲ 1% Gold production
(2025 Q1: 720koz)
Cerro
Vanguardia
▲ 3koz
Tropicana ▲ 2koz
Earnings, cash flow increase ahead of gold price
$1.2bn $1.3bn
▲ 190% Free cash flow*
(2025 Q1: $0.4bn)
▲ 187% Headline earnings***
(2025 Q1: $0.45bn)
$2.3bn $1.3bn
▲ 130% EBITDA*
(2025 Q1: $1.0bn)
▲ 189% Basic earnings
(2025 Q1: $0.44bn)
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
**Total cash costs* $1,377/oz for managed operations and $1,554/oz for non-managed joint ventures in Q1 2026; $1,213/oz for managed operations and $1,325/oz for non-managed joint ventures in Q1 2025.
***The financial measures "headline earnings (loss)" and "headline earnings (loss) per share" are not calculated in accordance with IFRS® Accounting Standards, but in accordance with the Headline Earnings Circular 1/2023, issued by the South African Institute of Chartered Accountants (SAICA), at the request of the Johannesburg Stock Exchange Limited (JSE). These measures are required to be disclosed by the JSE Listings Requirements and therefore do not constitute Non-GAAP financial measures for purposes of the rules and regulations of the SEC applicable to the use and disclosure of Non-GAAP financial measures.
GROUP PERFORMANCE │ Q1 2026 AT A GLANCE
O U R P O R T F O L I O O F W O R L D C L A S S A S S E T S A N D P R O J E C T S
Guinea
Siguiri (85%)
TIER 1
Lower cost │ Scale │ Growth potential
Iduapriem
Ghana
Obuasi
Colombia
Quebradona
DRC
Kibali (45%) (c)
Egypt
Sukari (50%)
United States of America
Arthur Gold Project(a) North Bullfrog Project
Nevada Regional Deposits(b)
Geita Obuasi Kibali
Assets
▼
Sukari Cuiabá Tropicana
Projects
▼
Nevada Quebradona
Tanzania
Geita
Gold Production
TCC* TCC
Margin*
AISC*
Legend
Tier 1 Assets
Tier 1 Projects
Tier 2 Assets Exploration
Brazil
AGA Mineração (Cuiabá)
Argentina
Cerro Vanguardia (92.5%)
Australia Tropicana (70%) Sunrise Dam
504koz $1,273/oz 74% $1,738/oz
TIER 2
Reliable cash generators │ FP focus │
Opportunities to improve cost competitiveness
Assets
▼
Sunrise Dam Siguiri Iduapriem
Cerro Vanguardia
Notes:
Arthur Gold Project (previously known as Expanded Silicon Project, includes the Silicon and Merlin deposits)
Includes deposits of Reward, Bullfrog, Mother Load, Crown Block (SNA, Secret Pass and Daisy) and the Sterling mine
Gold Production
TCC* TCC
Margin*
AISC*
Operated by Barrick Mining Corporation (Barrick) 220koz $1,615/oz 67% $2,185/oz
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
2025: Enhancing Shareholder Yield
Established an industry-leading dividend payout framework
Declared >$2.0bn** in dividends since the end of 2024
Successfully distributed >50% of our $2.9bn FCF in 2025
2026: Optimizing the Balance Sheet
Executed proactive liability management program
Successfully retired $666m of our long-dated bonds in April 2026
Stronger balance sheet to support long-term operational flexibility
Targeting a net cash* balance of c.$1bn at the end of 2026
2026: Strategic Share Repurchase
Proposing a new $2.0bn open-market share repurchase program
Enhancing capital returns in a disciplined way, in line with North American peers
Additional Dividends
Additional returns to shareholders
Long-term Debt Reduction
Potential Share Buybacks
Under supportive market conditions
Base dividend
(Minimum payout $0.125 per quarter)
Growth capital expenditure*
(Investing in future low cost growth)
Top up dividend
(payout to achieve 50% FCF* target)
Excess cash optionality
50% of Free Cash Flow
Robust Balance Sheet
< 1.0 x Net Debt* / EBITDA*
Sustaining capital expenditure*
Safe, stable operations
Cash flow from operations
Operational Excellence
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
** Includes $1,026m paid in dividends during Q1 2026.
RELIABLY CONVERTING HIGHER GOLD PRICE INTO CASH FLOWS AND SHAREHOLDER RETURNS
▲190% from Q1 2025
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
G O L D C O N T I N U E D T O O U T P A C E M O S T M A J O R A S S E T C L A S S E S , F U L L Y U N H E D G E D
Mar 2026
Local CPI(1)
Local FX: US$(2)
Inflation and
Exchange Rates
Mar 2025
Local CPI(1) Local FX: US$(2)
Pricing │ Group Average Gold Price Received*
($/oz)
2,874
USA
3.3%
-
2.4%
Ghana
3.2%
24.7%
22.4%
(29.9%)
Argentina
32.6%
(37.3%)
55.9%
(113.2%)
Australia
4.6%
1.4%
2.4%
(0.9%)
Tanzania
3.2%
3.1%
3.3%
(5.9%)
Guinea
3.3%
(1.2%)
3.7%
(0.7%)
Egypt
15.2%
0.6%
13.6%
(52.9%)
Brazil
4.1%
3.1%
5.5%
(13.7%)
Colombia
5.6%
5.1%
5.1%
(0.6%)
age inflation
3.5%
5.1%
Q1 2025
Q1 2026
Pricing │ Average Oil Price
($/bbl)
Q1 2025
4,863
75
71
Q1 2026
78
72
Brent Crude $bbl
Aver
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
Information sourced from Bloomberg and not always up to current reporting date
(1) Percentage change in respective index (CPI - Consumer Price Index)
(2) Percentage variance of annual average FX rate (FX - Foreign Exchange)
GROUP OPERATING RESULTS │ Q1 2026
H I G H E R G O L D P R I C E , I N F L A T I O N A N D F O R E I G N E X C H A N G E I M P A C T S D R I V I N G C O S T I N C R E A S E S
Salient Features
Q1 2026
Q1 2025
y-on-y Δ
Gold production - Group (koz)
724
720
+1%
Gold production - Managed operations (koz)
666
657
+1%
Total cash costs* - Group ($/oz)
1,391
1,223
+14%
Total cash costs* - Managed operations ($/oz)
1,377
1,213
+14%
AISC* - Group ($/oz)
1,955
1,640
+19%
AISC* - Managed operations ($/oz)
1,980
1,657
+19%
All gold production and gold sold metrics are stated on a consolidated basis for managed operations and on an attributable basis for non-managed joint ventures, unless otherwise stated.
Total cash costs* $1,377/oz for managed operations and $1,554/oz for non-managed joint ventures in Q1 2026; $1,213/oz for managed operations and $1,325/oz for non-managed joint ventures in Q1 2025. AISC* $1,980/oz for managed operations and $1,719/oz for non-managed joint ventures in Q1 2026; $1,657/oz for managed operations and $1,463/oz for non-managed joint ventures in Q1 2025.
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
GROUP FINANCIAL RESULTS │ Q1 2026
S I G N I F I C A N T C A S H F L O W A N D E A R N I N G S L E V E R A G E
Average Gold Price Received*
$4,863/oz
2025 Q1:
▲ $2,874/oz
EBITDA*
$2,291m
2025 Q1:
▲ $996m
Basic Earnings
$1,281m
2025 Q1:
▲ $443m
Headline Earnings**
$1,285m
2025 Q1:
▲ $447m
Capital Expenditure
- Group
$467m
2025 Q1:
▲ $336m
Net Cash Flow from Operating Activities
$1,709m
2025 Q1:
▲ $725m
Free Cash Flow*
$1,169m
2025 Q1:
▲ $403m
Net
(Cash) Debt*
$(868m)
2025 Q1:
$755m
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
**The financial measures "headline earnings (loss)" and "headline earnings (loss) per share" are not calculated in accordance with IFRS® Accounting Standards, but in accordance with the Headline Earnings Circular 1/2023, issued by the South African Institute of Chartered Accountants (SAICA), at the request of the Johannesburg Stock Exchange Limited (JSE). These measures are required to be disclosed by the JSE Listings Requirements and therefore do not constitute Non-GAAP financial measures for purposes of the rules and regulations of the SEC applicable to the use and disclosure of Non-GAAP financial measures.
BUSINESS COST PERFORMANCE
S T R O N G C A S H C O S T P E R F O R M A N C E F R O M M A N A G E D O P S D E S P I T E M A R K E T D R I V E N C O S T I N C R E A S E S
Total Cash Costs* - Q1 2026 vs Q1 2025
($/oz)
Market driven
Controllable
+16%
-2%
1,413 1,413
1,391
0
1,223
Normalised Non-managed Managed
Q1 2026
Flex Cost
Exchange
Fuel price
Royalty
Inflation
Q1 2025
43
117
-32
10
30
Total cash costs* $1,377/oz for managed operations and $1,554/oz for non-managed joint ventures in Q1 2026; $1,213/oz for managed operations and $1,325/oz for non-managed joint ventures in Q1 2025.
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
STRONG FREE CASH FLOW* GENERATION
H I G H E R G O L D P R I C E R E F L E C T S I N B O T T O M L I N E
Free cash flow* - Q1 2026 vs Q1 2025
($m)
51
-63
-141
403
-215
52
1,290
-83
-125
1,169
Q1 2025
Price
Sales Volume
Cash
Ops Cost
Working capital
Taxes
Capital
Distributions to
Q1 2026
receipts from
non-controlling
Kibali**
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
**Includes dividends received and loan repayments.
shareholders
GUIDANCE │ 2026
G R O W I N G M A R G I N S A N D S H A R E H O L D E R R E T U R N S
2026 Guidance
Group
2,800 - 3,170
Managed operations
2,530 - 2,860
Gold production (koz) Non-managed operations
270 - 310
Africa
1,890 - 2,150
Australia
495 - 555
Americas
415 - 465
Group All-in sustaining costs
1,780 - 1,990
Managed operations
1,825 - 2,050
Non-managed operations
1,355 - 1,460
Africa
1,780
Australia
2,100
Costs (1) ($/oz) Americas
1,725
Group Total cash costs
1,315 - 1,430
Managed operations
1,335 - 1,455
Non-managed operations
1,135 - 1,225
Africa
1,300
Australia
1,815
Americas
1,190
Group Total capital expenditure
1,825 - 1,975
Managed operations
1,640 - 1,770
Non-managed operations
185 - 205
Group Sustaining capital expenditure
1,040 - 1,140
Capital Expenditure (1) ($m) Managed operations
985 - 1,075
Non-managed operations
55 - 65
Group Non-sustaining capital expenditure
785 - 835
Managed operations
655 - 695
Non-managed operations
130 - 140
(1) The Company is not providing quantitative reconciliations to the most directly comparable IFRS measures for its Non-GAAP financial guidance shown above in reliance on the exception provided by Rule 100(a)(2) of Regulation G because the reconciliations cannot be performed without unreasonable efforts as such IFRS measures cannot be reliably estimated due to their dependence on future uncertainties and adjusting items, including, among other factors, changes in economic, social, political and market conditions, including related to inflation or international conflicts, the success of business and operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings, any supply chain disruptions, any public health crises, pandemics or epidemics, and other business and operational risks and challenges and other factors, including mining accidents, that the Company cannot reasonably predict at this time but which may be material. Outlook economic assumptions for 2026 guidance are as follows: $0.68/A$, BRL5.47/$, AP1,606/$, ZAR16.90/$, Brent $61/bbl and gold price of approximately $4,250/oz.
Cost and capital forecast ranges for 2026 are expressed in "nominal" terms. "Nominal" cash flows are current price term cash flows that have been inflated into future value, using an appropriate "inflation" rate. Cost and capital forecast ranges for 2027 are expressed in "real" terms. "Real" cash flows are adjusted for "inflation" in order to reflect the change in value of money over time. Estimates assume neither operational or labour interruptions or power disruptions, nor further changes to asset portfolio and/or operating mines and have not been reviewed by AngloGold Ashanti's external auditors. Other unknown or unpredictable factors, or factors outside the Company's control, including inflationary pressures on its cost base, could also have material adverse effects on AngloGold Ashanti's future results and no assurance can be given that any expectations expressed by AngloGold Ashanti will prove to have been correct. Measures taken at AngloGold Ashanti's operations together with AngloGold Ashanti's business continuity plans aim to enable its operations to deliver in line with its production targets. Actual results could differ from guidance, and any deviations may be significant. Please refer to the Risk Factors section in AngloGold Ashanti's annual report on Form 20-F for the financial year ended 31 December 2025 filed with the SEC.
LOOKING AHEAD
Cuiabá, Brazil
2026 FOCUS AREAS │ DISCIPLINED EXECUTION
L A S E R F O C U S E D O N M A I N T A I N I N G C O S T D I S C I P L I N E
Total Cash Costs*
Protecting Margins
Sustaining Capital*
Protecting the Core
Growth Capital*
Disciplined, High Return Expansion
Full Asset Potential to offset inflationary pressures
Increase production share from
Tier One assets
Active portfolio management
Appropriately capitalised assets for safe, sustainable operations
Advance Mineral Reserve
Development to improve flexibility
Continued Mineral Reserve replacement and growth
Major long-term growth projects in Nevada
Create flexibility for life extension,
brownfield growth
Short-cycle, high-return organic projects to strengthen portfolio
*Refer to appendices below and "Non-GAAP disclosure" in AngloGold Ashanti's Earnings Release for the three months ended 31 March 2026 for definitions and reconciliations.
STRATEGIC CATALYSTS │ DE-RISKING HIGH-MARGIN GROWTH
M U L T I - S T A G E O P T I O N S I N E X E C U T I O N A N D S T U D I E S U N D E R W A Y O N C A P I T A L E F F I C I E N T G R O W T H P R O J E C T S
Siguiri
Options include - combine pits, expand fleet, transitioning plant to 12mtpa full fresh rock feed
Extend life through Mineral Reserve growth, infrastructure upgrades
Cuiabá
Extend life through Mineral Reserve growth, infrastructure upgrades
Increase plant throughput via Line 2 refurbishment
Higher ore feed from satellite operations
Sukari
Mining expansion: new portal, fleet upgrade, accelerated stripping
Processing: new adsorption tank, gravity circuit to improve recovery
Geita
Advancing plant expansion evaluation
Ongoing exploration to unlock potential underground and open pit upside
Obuasi
Growing production by an additional ~130koz to achieve targeted 400koz/pa by 2028
GREENFIELD
GROWTH
c.500koz/pa
Nevada
Arthur Gold Project (Merlin): Advancing to full Feasibility Study in H2 2026
Ongoing Mineral Resource conversion drilling targeting the upgrade of 1.4 Moz from Inferred to Indicated categories
North Bullfrog: NEPA Record of Decision anticipated by end of 2026
CONCLUSION │ RE-RATING GAINS MOMENTUM, MORE TO COME
Superior cash flow and dividend
yields, disciplined execution, and an attractive valuation position AngloGold Ashanti for continued outperformance
S U P E R I O R Y I E L D S I N T H E M A R K E T ' S M O S T A T T R A C T I V E V A L U A T I O N Q U A D R A N T
AGA
Low Return, Premium Valuation
Low Return, Discounted Valuation
Target Zone
High Return,
Premium Valuation
Bubble size: FCF Yield, AGA NTM 9%
High Return, Attractive Multiple
Visible Alpha data for the next twelve months (NTM) - 7 May 2026
Company reports, Grey bubbles represent the Peer group: Agnico-Eagle, Barrick, Gold Fields, Kinross and Newmont
w w w . a n g l o g o l d a s h a n t i . c o m
ANDREA MAXEY
Telephone: +61 08 9435 4603
Mobile: +61 400 072 199
YATISH CHOWTHEE
Telephone: +27 11 637 6273
Mobile: +27 78 364 2080
INVESTOR RELATIONS
General e-mail enquiries
APPENDIX A │ ALL-IN SUSTAINING COSTS
F O R T H E Q U A R T E R E N D E D 3 1 M A R C H 2 0 2 6
ALL-IN SUSTAINING COSTS
Geita
Sukari
Obuasi
Tropicana -Attr. 70%
AngloGold Ashanti Mineração
Projects
Sub-total
Kibali -Attr. 45%
Tier 1
Sunrise Dam
Siguiri
Iduapriem
Cerro Vanguardi a
Tier 2
Corporate and other
(2)
Non-managed joint ventures
Managed operations
Group Total (3)
Cost of sales
204
209
110
151
104
-
778
123
901
126
164
93
121
504
11
123
1 293
1 416
By-product revenue
(3)
(2)
-
(2)
(5)
-
(12)
(1)
(13)
(1)
-
-
(69)
(70)
-
(1)
(82)
(83)
Amortisation of tangible, intangible and right of use assets
(55)
(92)
(22)
(37)
(23)
-
(229)
(20)
(249)
(19)
(12)
(12)
(18)
(61)
(1)
(20)
(291)
(311)
Adjusted for decommissioning and inventory amortisation
-
-
-
-
-
-
-
-
-
-
-
-
2
2
-
-
2
2
Corporate administration, marketing and related expenses
-
-
-
-
-
-
-
-
-
-
-
-
-
-
44
-
44
44
Lease payment sustaining
5
1
-
6
6
1
19
1
20
2
1
1
-
4
1
1
24
25
Sustaining exploration and study costs
2
-
-
-
-
-
2
-
2
1
3
-
-
4
-
-
6
6
Total sustaining capital expenditure
67
30
42
11
31
1
182
16
198
16
31
39
21
107
-
16
289
305
All-in sustaining costs (4)
221
145
130
130
113
2
741
119
860
125
187
122
56
490
55
119
1 286
1 405
Gold sold - oz (000)
123
102
59
78
64
-
426
69
495
51
78
45
50
224
-
69
650
719
All-in sustaining costs per ounce - $/oz (1)
1 797
1 421
2 210
1 674
1 768
-
1 741
1 719
1 738
2 438
2 391
2 737
1 117
2 185
-
1 719
1 980
1 955
(1) In addition to the operational performances of the mines, "all-in sustaining costs per ounce" and "total cash costs per ounce" are affected by fluctuations in the foreign currency exchange rate. AngloGold Ashanti reports "all-in sustaining costs per ounce" calculated to the nearest US dollar amount and gold sold in ounces. AngloGold Ashanti reports "total cash costs per ounce" calculated to the nearest US dollar amount and gold produced in ounces. Costs per ounce may not be calculated based on amounts presented in this table due to rounding.
(2) Corporate and other includes non-gold producing managed operations and comprises Corporate, Africa other, Australia other and Americas other.
(3) Total including equity-accounted non-managed joint ventures.
(4) "Total cash costs per ounce" and "all-in sustaining costs per ounce" may not be calculated based on amounts presented in this table due to rounding. Rounding of figures may result in computational discrepancies.
Q1 2026 EARNINGS RESULTS 20
N
Disclaimer
Anglogold Ashanti plc published this content on May 08, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on May 08, 2026 at 10:02 UTC.