Quarter Highlights
Thalanga Mine
Hillgrove Gold Project
Corporate
Address: Level 6, 350 Collins Street, Melbourne, VIC, 3000, Australia
For personal use only
1. SAFETY AND ENVIRONMENTAL PERFORMANCE
1.1. Thalanga Base Metal Operations Safety and Environmental Performance
Thalanga's site headcount during the period was 139 people. There were 64 full-time Red River Resources employees and an additional 75 contractors working in exploration and mining, with a total 90,346 hours worked. The Total Recordable Injury Frequency Rate (TRIFR) is 16.1 for December YTD. There were no medically treated injuries during the quarter, and no Lost Time Injury (LTIs).
1.2. Hillgrove Gold Mine Safety and Environmental Performance
Hillgrove's site headcount during the period was 62 people including contractors with 32,572 hours worked. The Total Recordable Injury Frequency Rate (TRIFR) is 7.3 for December YTD. There was one medical treated injury during the quarter, and zero Lost Time Injuries (LTIs).
1.3. Coronavirus (COVID-19) Update
Red River continues to implement preventative measures to reduce risk to employees and operations at all sites. These preventative measures include increased hygiene practices, restrictions on non-essential travel, social distancing, limiting visitors to site and remote working where possible.
Reduced mining production labour levels at Thalanga negatively impacted production during the quarter. Red River continues to work closely with the mining contactor to ensure manning levels are as close to plan as possible.
Thalanga and Hillgrove are residential operations and Red River is striving to ensure its workforce and the communities in which it operates are not impacted.
Address: Level 6, 350 Collins Street, Melbourne, VIC, 3000, Australia
T: +61 3 9017 5380 F: +61 3 9670 5942 W: www.redriverresources.com.au
2
For personal use only
2. THALANGA BASE METAL OPERATIONS (QUEENSLAND)
Red River's Thalanga Operations is located approximately 65km southwest of Charters Towers in Northern Queensland and 200km from Townsville. Thalanga consists of a 650ktpa capacity processing plant which produces separate copper, lead and zinc concentrates with material precious metal (gold and silver) credits.
Thalanga is in the highly prospective Cambro-Ordovician Mt Windsor Volcanic Belt which contains a number of known polymetallic (copper-lead-zinc +/- gold-silver) volcanic hosted massive sulphide (VHMS) deposits and gold deposits.
Red River acquired the Thalanga Operations in 2014 and commenced production from the West 45 deposit in 2017. Production from West 45 ceased in 2020 and ore for the Thalanga Operation is currently being sourced from the Far West underground mine, with plans to develop the Liontown deposit to extend the operational life of Thalanga.
2.1. Operations Update
Thalanga Operations mined 62kt @ 1.3% Cu, 1.6% Pb, 4.6% Zn, 0.2 g/t Au & 39 g/t Ag (12.0% Zn Eq.), and processed 62kt of ore grading 1.1% Cu, 1.7% Pb, 4.5% Zn, 0.3 g/t Au & 52 g/t Ag (11.1% Zn Eq.).
Changes to Thalanga's ground control management plan required additional ground support to be installed retrospectively in all existing and future ore drives. This created a significant workload which impacted access to current stoping fronts and reduced Thalanga's production in October and November along with labour shortages due to covid. The mine is progressively installing the additional ground support on an ongoing basis and production improved in December.
Copper concentrate production for the quarter was 1,996 DMT. Copper recovery to copper concentrate averaged 79.7% for the period, with an average copper concentrate grade of 26.9% Cu, 3.6 g/t Au and 388 g/t Ag.
Zinc concentrate production for the quarter was 4,697 DMT zinc. Zinc recovery to zinc concentrate averaged 87.3% for the period and a high-quality zinc concentrate grading 51.9% zinc was produced.
Lead concentrate production for the quarter was 1,100 DMT lead concentrate produced. Lead recovery to lead concentrate was 64.8%, with an average concentrate grade of 62.2% Pb, 3.7 g/t Au & 1,458 g/t Ag produced during the period.
2.2. Concentrates Sales & Marketing
Thalanga sold 4,929 DMT zinc concentrate, 1,137 DMT lead concentrate and 2,022 DMT copper concentrate during the quarter. Base metal concentrates were delivered under long-term offtake agreements to Trafigura (zinc and lead concentrate) and Glencore (copper concentrate). The Company continued to execute a short- term hedging program over the quotation period (QP) for sales of zinc and lead metal already produced. Typically, between 80 and 90% of the payable zinc and lead metal for each shipment of zinc and lead concentrates was hedged for the period from the issue of the first provisional sales invoice to the final settlement of the sale, which may occur one to three months later. The QP hedges currently in place on the quarter's zinc concentrate sales range between US$1.34 and US$1.58 per pound of payable zinc metal, were between US$0.98 and US$1.09 per pound of payable lead metal in lead concentrate and ranged between US$4.22 and US$4.40 per pound of payable copper metal in copper concentrate.
Address: Level 6, 350 Collins Street, Melbourne, VIC, 3000, Australia
T: +61 3 9017 5380 F: +61 3 9670 5942 W: www.redriverresources.com.au
3
Table 1: Thalanga Operations Summary for Q2 FY2022 (Quarter ended 31 December 2021)
Units
Q2
Q3
Q4
Q1
Q2
YTD
FY21
FY21
FY21
FY22
FY22
FY22
only
Total Tonnes Mined
kt
92
87
101
103
62
165
Copper grade
%
1.2
1.2
1.2
1.3
1.3
1.3
Lead grade
%
1.4
1.4
1.3
1.6
1.6
1.6
Zinc grade
%
4.0
4.3
4.0
4.4
4.6
4.5
Gold grade
g/t
0.2
0.2
0.2
0.2
0.2
0.2
Silver grade
g/t
44
43
40
37
39
38
Zinc equivalent grade
%
10.2
10.8
10.1
11.1
12.0
11.4
use
Ore Processed
kt
112
95
97
107
62
169
Copper grade
%
1.1
1.1
1.1
1.3
1.1
1.2
Lead grade
%
1.6
1.7
1.4
1.6
1.7
1.7
Zinc grade
%
3.9
4.4
3.9
4.3
4.4
4.5
Gold grade
g/t
0.2
0.2
0.2
0.3
0.3
0.3
Silver grade
g/t
42
49
44
45
52
48
Zinc equivalent grade
%
10.3
10.9
10.0
11.4
11.1
11.3
personal
Zinc Concentrate Produced
DMT
7,430
6,959
6,311
7,539
4,697
12,236
Lead concentrate sold
DMT
2,024
1,484
1,471
1,983
1,137
3,120
Zinc grade
%
52.8
53.4
52.7
54.4
51.9
53.4
Zinc recovery
%
89.1
89.1
89.0
88.7
87.3
88.2
Lead Concentrate Produced
DMT
1,914
1,613
1,350
1,984
1,100
3,084
Lead grade
%
68.8
67.1
68.1
62.7
62.2
62.5
Gold grade
g/t
4.7
5.1
4.0
3.8
3.7
3.8
Silver grade
g/t
1,497
1,541
1,447
1,304
1,458
1,359
Lead recovery
%
74.4
69.2
66.2
71.5
64.8
68.9
Copper Concentrate Produced
DMT
3,564
3,068
3,565
4,411
1,996
6,407
Copper grade
%
28.4
25.7
24.0
27.0
26.9
27.0
Gold grade
g/t
1.4
1.7
1.8
2.1
3.6
2.5
Silver grade
g/t
299
318
351
312
388
336
Copper recovery
%
79.4
74.5
80.1
84.5
79.7
82.9
Zinc concentrate sold
DMT
8,286
6,700
6,261
7,501
4,929
12,430
For
Copper concentrate sold
DMT
3,735
3,025
3,398
4,588
2,022
6,610
Address: Level 6, 350 Collins Street, Melbourne, VIC, 3000, Australia
T: +61 3 9017 5380 F: +61 3 9670 5942 W: www.redriverresources.com.au
4
For personal use only
8,000
7,000
(tonnes)
6,000
5,000
Produced
4,000
Concentrate
3,000
2,000
1,000
0
Q2 FY21
Q3 FY21
Q4 FY21
Q1 FY22
Q2 FY22
Lead Concentrate
Copper Concentrate
Zinc Concentrate
Figure 1: Thalanga Quarterly Concentrate Production
Thalanga Revenue by Metal Q2 FY22
32%
44%
10% 2%
12%
Copper
Gold
Silver
Lead
Zinc
Figure 2: Thalanga Q2 FY22 Revenue Split
Address: Level 6, 350 Collins Street, Melbourne, VIC, 3000, Australia
T: +61 3 9017 5380 F: +61 3 9670 5942 W: www.redriverresources.com.au
5
This is an excerpt of the original content. To continue reading it, access the original document here.