Tietto Minerals : Hits 152 g/t Au from 37m within 10m @ 16.53 g/t Au

TIE.AX

For personal use only

Tietto Minerals Ltd

Unit 7, 162 Colin Street

Perth, WA 6005

Tel: +61 8 9420 8270

Web: www.tietto.com

20 January 2022

Tietto hits 152.26 g/t Au from 37m within 10m @ 16.53 g/t Au at AG Core

Highlights:

West African gold explorer and developer Tietto Minerals Limited (ASX: TIE) (Tietto or the Company) is pleased to report high‐grade gold results from the eighth batch of infill and

For personal use only

Tietto Minerals Ltd

Unit 7, 162 Colin Street

Perth, WA 6005

Tel: +61 8 9420 8270

Web: www.tietto.com

extensional drilling completed at the Abujar‐Gludehi (AG) deposit, part of its 3.35Moz Abujar Gold Project in Côte d'Ivoire, West Africa.

Tietto Managing Director, Dr Caigen Wang, said: "Our eighth batch of results from our infill drilling program at AG has delivered further high‐grade gold intercepts close to surface that will de‐risk open pit mining at Abujar. Our exploration team has now completed the infill drilling program, which was designed to convert Indicated Resources to Measured Resources scheduled to be mined over the first two years of production.

Down‐dip drilling below AG Core has confirmed the extension of high‐grade shoots 150m below the previous resource drilling. These new results will be incorporated into the upcoming mineral resource update. AG Core remains open at depth and further holes are planned to test the limits of this growing gold system.

With completed settlement of the second tranche of our recent capital raise, we are now fully funded to production at Abujar, which has potential to be one of the largest gold producing mines in Côte d'Ivoire, expected to produce more than 260,000 ounces of gold in the first year and 1.2M ounces of gold in the first six years.

"We are well positioned to execute our dual strategy in 2022; our exploration team is planning on drilling 100,000m of diamond core this year to drive resource growth, and our build team is advancing construction work on schedule as we develop the Abujar Gold Project into West Africa's next gold mine."

Drilling Results

This announcement relates to 38 diamond drill holes (8,871.5m) completed as part of Tietto's infill and extensional diamond drilling programs. The infill drilling program was designed to increase confidence in Abujar mineral resource estimates (i.e., upgrading Indicated Resources to Measured Resources). The extensional drilling is designed to test the limits of gold mineralisation at AG Core below the current resource model.

Tietto Minerals Ltd Unit 7, 162 Colin Street Perth, WA 6005 Tel: +61 8 9420 8270 Web: www.tietto.com

r personal use only

Figure 1: Plan view showing latest drill results at AG Core and AG South

Tietto Minerals Ltd Unit 7, 162 Colin Street Perth, WA 6005 Tel: +61 8 9420 8270

Web: www.tietto.com

For personal use only

Figure 2: Oblique cross section showing latest drill results at AG Core (Section 20 +/‐50m)

For personal use only

Tietto Minerals Ltd

Unit 7, 162 Colin Street

Perth, WA 6005

Tel: +61 8 9420 8270

Web: www.tietto.com

Infill Drilling - AG Core

Results are presented for 16 diamond drill holes (3,074m) completed as part of Tietto's infill drilling program which aims to increase confidence in Abujar mineral resource estimates (i.e., upgrading Indicated Resources to Measured Resources).

More significant intersections from the latest batch of assays received for 1m diamond drill samples are summarised in Table 1.

Table 1: Significant Intersections from AG Core Infill 3

Hole id

Depth from

Depth to

Length

g/t Au

Includes4

ZDD788

83

95

12

1.28

4m @ 2.46 g/t Au

ZDD789

95

97

2

8.38

2m @ 8.38 g/t Au

ZDD790

117

131

14

2.14

6m @ 4.44 g/t Au

ZDD793

116

127

11

1.39

6m @ 1.63 g/t Au

ZDD796

144

154

10

3.01

5m @ 5.59 g/t Au

ZDD805

105

115

10

3.04

3m @ 8.34 g/t Au

ZDD806

11

29

18

3.67

6m @ 8.27 g/t Au

ZDD817

112

126

14

2.14

7m @ 3.26 g/t Au

ZDD859

37

47

10

16.53

5m @ 32.61 g/t Au

ZDD859

113

114

1

21.87

1m @ 21.87 g/t Au

Drill collar details and assay results are in Table 7 and Table 10 respectively. Location of the reported drill collars and associated assay results is presented in Figure 1. An oblique cross‐ section highlighting selected assay results is presented in Figure 5 and an oblique long section presents the results in Figure 6.

Tietto is completing infill drilling at AG on 25m line spacing (Measured Resource) between Section Lines 14 to 30 across the AG Core to a depth covering the first two years of gold production at Abujar (~120m vertical depth).

Tietto has now reported results for 176 holes for 32,401m with the release of this eighth batch. Significant intersections (>=20 gold gram metres) from the program including those from this release are presented in Table 2.

Table 2: AG Core ‐ significant intersections from infill program greater than 20 gold gram metres5

Hole id

From

To

Length

g/t Au

gold gram metres

ASX Reporting

ZDD685

54

56

2

143.77

288

13 Oct 2021

ZDD687

69

85

16

17.60

282

22 Sep 2021

ZDD696

125

132

7

30.67

215

21 Oct 2021

ZDD859

37

47

10

16.53

165

20 Jan 2022

ZDD665

97

119

22

5.62

124

13 Oct 2021

This is an excerpt of the original content. To continue reading it, access the original document here.

Disclaimer

Tietto Minerals Ltd. published this content on 19 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 19 January 2022 22:45:09 UTC.