Alderan recommences Detroit drilling with focus on historical

Drum gold mine

HIGHLIGHTS

only

• Drilling recommences at Alderan's Detroit Project in Utah, USA with focus on historical Drum

open pit gold mine which produced 125,000oz gold.

• Drum is geologically open along strike and down dip and has not received any modern

use

exploration since mining ceased in 1989.

• Alderan has planned 10 holes (~1,200m) to verify and extend known historical mineralisation.

• Modelling of historical drill data highlights strong potential for remnant mineralisation, high-

grade gold in structural zones and mineralised extensions at Drum.

• Alderan's in-pit rock samples at Drum assay up to 10.7g/t gold with 36 of 76 samples assaying

+0.5g/t gold and 22 assaying +1.0g/t gold

• First results from Drum drilling expected in March following remaining Detroit drill results.

Alderan Resources Limited (ASX: AL8) (Alderan or the Company) is pleased to announce drilling at its Detroit Project, located in the Drum Mountains region of western Utah, USA, has recommenced with 10 holes planned

t the Drum Gold Mine (Drum).

Drum is an oxide gold deposit in the southeast of the Detroit project area. The open pit mine produced 125,000oz gold between 1984-89 and Alderan's historical drill hole modelling indicates1,2:

personal•

Drum has returned long and high-grade historical drill intercepts. The longest intercept grading ≥1.0g/t gold

Exploration potential exists for approximately 1.2 - 1.5 million tonnes of remnant mineralisation grading of

approximately 1.1 - 1.4g/t gold (approximately 42,000 - 67,000 ounces) based solely on historical drillholes.

This exploration potential quantity and grade is conceptual in nature, that there has been insufficient

exploration to estimate a Mineral Resource and that it is uncertain if further exploration will result in the

estimation of a Mineral Resource.

Drum is geologically open along strike to the south and down dip to the southwest where hole YC-174

intersected 15.2m @ 4.5g/t gold (includes 6.1m @ 10.3g/t Au) 150m down dip from West Pit historical ore.

The mined East Pit ore horizon remains open down dip below the West Pit and has not been drill tested.

For

is 70.1m and the highest-grade individual assay over a 5ft (~1.54m) sample interval is 38.8g/t gold.

Historical intersections from drilling undertaken by Western States Minerals and Nevada Resources Inc in

1982-89 include:

o

YC-58A: 13.7m @ 6.4g/t Au from 13.7m downhole including 4.6m @ 18.1g/t Au

o

YC-60: 24.4m @ 2.7g/t Au from 9.1m downhole including 7.6m @ 7.6g/t Au

o YC-113A: 22.9m @ 5.0g/t Au from 19.8m downhole including 9.1m @ 10.8g/t Au

o

YC-169: 35.1m @ 4.3g/t Au from 25.9m downhole including 18.3m @ 7.7g/t Au

ASX ANNOUNCEMENT

20 January 2022

Alderan

Managing

Director,

Scott

only

Caithness said: "It is rare to secure an

historical gold mine which has remained

by our modelling of historical drilling and in-

unexplored for more than 30 years and

Alderan is excited to test this target with

modern exploration techniques after it has

sat dormant for so long.

"The potential of Drum to host a significant

gold deposit has clearly been demonstrated

use

pit rock

sampling.

Our 10-hole drill

programme aims to both verify the historical

work and confirm Drum's upside potential

and we look forward to results from it."

Detroit Drilling Update4

Alderan

re-commenced

its

drilling

personal

programme at Detroit following rig

maintenance and a break over Christmas-

New Year. Drilling will focus on the Drum

Gold Mine where 10 holes are planned

totalling approximately 1,200m.

Figure 1: Detroit project geology showing location of Drum Gold Mine.

The planned drilling at Drum is aimed at

both verifying historically drilled gold

mineralisation and also testing for new mineralisation. A key focus of testing for new mineralisation will be drilling

below the West Pit into the down dip extensions of the Tatow Formation, the prime ore horizon in the East Pit.

The table below summarises the planned holes:

Drill Site

Easting

Northing

Target

Site Rationale and Target

Depth (m)

Site I-1

327 449

4 377 326

120

East Pit: Verify remnant mineralisation at bottom of YC-16 which

intersected 56.4m @ 1.8g/t Au.

Site A-1

327 209

4 377 250

50

West Pit: Verify remnant mineralisation at bottom of YC-114 which

intersected 9m @ 2.0g/t Au.

Site A-2

327 209

4 377 250

110

West Pit: Verify remnant mineralisation at bottom of YC-72 which

intersected 9m @ 1.4g/t Au & Tatow test.

For

Site M-1

327 460

4 377 150

120

East Pit: Verify remnant mineralisation at bottom of DM-23 which

intersected 16.8m @ 1.2g/t Au.

Site M-2

327 455

4 377 150

120

East Pit: Tatow test below dropcut.

Site B

327 243

4 377 045

150

West Pit: Verify remnant mineralisation at bottom of YC-169 which

intersected 35m @ 4.3g/t Au & Tatow test.

Site G

327 409

4 377 146

140

West Pit: Tatow test in hanging wall of King Tut fault.

Site H

327 458

4 377 250

135

East Pit: Test down dip extension of YC-16 which intersected 56.4m

@ 1.8g/t Au.

Site E

327 369

4 377 104

100

West Pit: Tatow test in hanging wall of King Tut fault.

Site Ma-01

327 096

4 376 904

120

West Pit Extension: Verify YC-174 which intersected 15.2m @ 4.5g/t

Au; permit amendment required.

4 Alderan ASX announcements dated 15 October 2021, 12 November 2021, 8 December 2021, 16 December 2021, 30 December 2021.

ASX ANNOUNCEMENT

20 January 2022

onlyuse

personalFigure 1: Aerial view of Drum Gold Mine showing historical and proposed drill sites. Priority 1 sites (yellow) will be drilled in the current Detroit drilling programme while Priority 2 sites (green) are contingent.

ForNext Steps

Alderan awaits assays for drill holes 7DD21-003,6DD21-004,6DD21-005 and 6DD21-006 which were completed on its Detroit project prior to the 2021 Christmas-New Year shutdown. Assays for a 21m section of hole 6DD21-004 and a 31.8m section of hole 6DD21-005 were released on the ASX by Alderan on 30 December 2021.

In addition to the drilling at Detroit, geological mapping and magnetic geophysical surveying are proposed at Drum to improve the geological understanding of the deposit.

ASX ANNOUNCEMENT

20 January 2022

Drum Background

onlyAlderan secured an option over the Drum Gold Mine, one of the most productive and economically important sediment-hosted gold deposits in Utah, in late September 2021 as part of its strategy to consolidate the Detroit mining district5.

Drum was discovered in 1982 with a drill intercept of 15m grading 8.5g/t gold and was mined from the adjacent East and West pits between 1984-896. Over its six-year mine life, it reportedly produced 125,000oz of gold from 3.17 million tonnes of oxide ore grading 1.22g/t gold. Towards the end of its life, a small underground

peration was developed in the West Pit which produced mined grades of +4g/t gold.

useAlderan's review of historical drill hole data at Drum suggests exploration potential for approximately 1.2 - 1.5 million tonnes of remnant mineralisation at a grade of approximately 1.1 - 1.4g/t gold (approximately 42,000- 67,000 ounces)7. This estimate of exploration potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate Mineral Resources and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

The mineralisation remains open along strike to the south and down dip to the southwest where drill holes include YC-174 which intersected 15.2m grading 4.5g/t gold (including 6.1m at 10.3g/t Au) 150m from historical ore in

the West Pit. The ore horizon mined in the East Pit remains open down dip to the southwest and has not been

personaldrill tested below the West pit. Drum has both long and high-grade historical drill intercepts. Hole DM-9 intersected 70.1m grading 1.0g/t gold and the highest-grade individual assay over a 5ft (~1.5m) sample interval

is 38.8g/t gold.

Alderan composite grab rock chip sampling along the outcropping walls of the East and West pits focussed on altered target host rocks of the Tatow and Chisholm formations which were the prime ore horizons during historical mining and in visible structural zones interpreted to be potential hosts of high-grade mineralisation. This sampling verified the potential of Drum with the highest gold assay being 10.65g/t over a 2.8m sampling interval. Additional high-grade sample intervals include 1.7m grading 7.01g/t gold and 2.8m grading 5.86g/t gold. A total of 36 samples of the 76 collected grade +0.5g/t gold with 22 of these grading +1.0g/t gold. An additional 17 samples grade +0.15g/t gold which is above the cutoff for oxide gold leach operations in neighbouring Nevada.

For

ASX ANNOUNCEMENT

20 January 2022

onlyuse

prsonaleFigure 3: Oblique view from south of Drum Gold Mine 3D block model on digital terrain model showing historical drill holes, section lines and highlighting the zone of historical drill hole YC-174 which intersected 15.2m @ 4.5g/t Au (including 6.1m @ 10.3g/t Au)

fr m 73.2m downhole. Mineralisation extends subsurface below both pits and is open to the south- southwest. The block model has been estimated from the historical (1980s) drill hole data applying Multiple Indicator Kriging technique. The waste blocks which

grade lower than 0.1g/t gold are not shown.

For

OPEN

OPEN

Figure 4: Northeast-southwest long section (A-A') showing the Drum Gold Mine block model based on historical (1980s) drill holes and Alderan's interpreted geology. The modelled gold mineralisation extends below and to the southwest of the historical pit boundaries indicating potential for remnant mineralisation and hole YC-174 highlights the potential for high grade extensions down dip of the West Pit. Also, the mineralisation is modelled within two separate stratigraphic horizons, the Tatow Member and the Chisholm Formation which dip ~20-30 degrees southwest. The Tatow has not been adequately drilled down dip of the East Pit.

This is an excerpt of the original content. To continue reading it, access the original document here.

Disclaimer

Alderan Resources Ltd. published this content on 19 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 19 January 2022 21:25:20 UTC.