LEG.AX
QUARTERLY REPORT
DECEMBER 2021
ASX:LEG | 19 JANUARY 2022
LEGEND MINING LIMITED
HIGHLIGHTS - Rockford Project, Fraser Range
ASX Symbol: LEG
• Data
collection
phase
of 3D
seismic survey
completed in December 2021
only
ABN 22 060 966 145
use
• 24,703m of diamond drilling and 15,222m of aircore
drilling completed during the 2021 field season
Level 1, 8 Kings Park Road
West Perth
• Cash and receivables $18.8M at 31 December 2021
Western Australia 6005
OVERVIEW
PO Box 626
West Perth
Legend completed the data collection phase of a 6.5km2 3D seismic
personalManaging Director
survey at the Mawson prospect in December 2021. This is the first
Western Australia 6872
Phone:
+61 8 9212 0600
ever seismic survey over a greenfields exploration nickel-copper
Facsimile:
+61 8 9212 0611
prospect by a junior in the Fraser Range. The final product
Email:
(processed and modelled data) is scheduled for early February
2022 and is expected to delineate targets for diamond drilling which
Website:
is planned to commence in March 2022. It is important to note that
www.legendmining.com.au
Legend has a large geological data base at Mawson which will
greatly assist in fingerprinting features identified by the
CONTACT
interpretation of the seismic survey data.
Mr Mark Wilson
Our geology team is to be congratulated for drilling circa 40,000m
of diamond and aircore drilling during the 2021 field season under
the trying circumstances for managing the COVID 19 pandemic.
Mr Oliver Kiddie
Assay results from this drilling are still awaited at the time of this
report, as one small example of these conditions.
Executive Director
With $18.8M in cash and receivables, a new seismic data set
ForPROJECTS
imminent at
Mawson and
ongoing
regional
aircore drilling and
MLTEM programmes, we are looking forward to another productive
Rockford - Fraser Range:
year at the Rockford project.
Nickel-Copper(Ni-Cu)
Copper-Zinc-Silver(Cu-Zn-Ag)
Gold (Au)
DECEMBER 2021 QUARTERLY REPORT
1 | P a g e
For personal use only
QUARTERLY REPORT
ROCKFORD PROJECT (Fraser Range District)
Nickel-Copper,Copper-Zinc-Silver, Gold
Legend's Rockford Project is located in the highly prospective Fraser Range district of Western Australia and considered prospective for mineralisation styles including magmatic nickel-copper, VMS zinc-copper-silver and structurally controlled gold.
The Rockford Project comprises 15 granted exploration licences (14 contiguous) covering a total area of 3,056km2 (see Figure 1). A detailed breakdown of ownership, area and manager is given below:
Exploration activities completed during the December 2021 Quarter at the Rockford Project included continued focused exploration on the Mawson prospect, as well as highly ranked regional targets. Systematic step-out diamond drilling continued to grow the Mawson intrusion to the north- east, intersecting mineralised intrusion as well as defining the architecture of the Mawson intrusion in relation to the country rock. The evolving understanding of the Mawson structural architecture has resulted in the potential identification of trap sites for massive Ni-Cu sulphide accumulations in this north-east zone. 3D model evolution utilising updated geophysical and geological modelling continues to drive focused exploration targeting, with the mineralised intrusive footprint growing significantly. In addition, a 3D seismic survey was completed by HiSeis Pty Ltd to define the architecture of the Mawson intrusion in relation to the stratigraphic package to a minimum 1000m below surface. Regionally, first-pass diamond drilling by Legend has been completed at highly ranked targets Hurley, Crean, and the new Northerly prospect. Aircore drilling across greater Mawson and regionally across prospective targets has been completed, with MLTEM survey completed across multiple new target areas of the Rockford Project (see Figure 1).
DECEMBER 2021 QUARTERLY REPORT
2 | P a g e
QUARTERLY REPORT
For personal use only
DECEMBER 2021 QUARTERLY REPORT
3 | P a g e
QUARTERLY REPORT
For personal use only
Mawson Prospect
3D Seismic Survey
HiSeis has completed the 3D seismic survey data acquisition phase at the Mawson Prospect (see Figure 1). Data processing has commenced, with delivery of final product is expected by February 2022.
The aim of the survey is to define the architecture of the Mawson intrusion in relation to the stratigraphic package, to a depth of investigation of a minimum 1000m below surface across a 6.5km2 area (See Figure 2). In addition, a more detailed survey on the western side of the survey area has been designed to test for a direct detection signature of Ni-Cu-Co sulphide accumulations at the Mawson discovery zone, given the shallow nature of mineralisation (<250m below surface).
On receival of the final results of this 3D seismic survey, Legend will conduct an intensive process of interrogation, including incorporation of existing geophysical, geological, geochemical, and structural datasets with the aim to define and rank new diamond drilling targets for the 2022 field season across the Mawson intrusion.
DECEMBER 2021 QUARTERLY REPORT
4 | P a g e
For personal use only
QUARTERLY REPORT
Diamond Drilling
Diamond drilling continued during December 2021 Quarter, with 9 holes completed (RKDD061 and RKDD073-RKDD080), resulting in a total of 21,202.4m drill metres completed for the 2021 field season (see Figure 1, Figure 3, and Table 1). Systematic step-out diamond drilling continues to grow the Mawson intrusion to the north-east, intersecting mineralised intrusion as well as defining the architecture of the Mawson intrusion in relation to the country rock. The evolving understanding of the Mawson structural architecture has resulted in the potential identification of trap sites for massive Ni-Cu sulphide accumulations in this north-east zone.
The 3D model driving predictive exploration at Mawson continues to evolve with new data and continues to be very accurate as a predictive tool for targeting interpreted fertile intrusion. The updated 3D constrained gravity model at this stage appears to have a high correlation for mineralised intrusion. To date, the mineralised intrusive footprint at Mawson extends over 1.6km in strike length. The northern most drill section completed suggests intersection of a new intrusion adjacent to the Mawson intrusion.
Future diamond drilling planning at Mawson will focus on continued definition of these mineralised intrusive bodies at depths below 500m based on the interpretation of the seismic data. Geological, structural, and geochemical datasets will be combined with seismic, gravity, magnetic, and DHTEM datasets to design our 2022 diamond drill programme to test targets for massive Ni-Cu sulphide accumulation.
DECEMBER 2021 QUARTERLY REPORT
5 | P a g e
This is an excerpt of the original content. To continue reading it, access the original document here.
Disclaimer
Legend Mining Limited published this content on 18 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 18 January 2022 21:41:02 UTC.