Arizona Metals Corp. Announces Assay Results from One Drill Hole in the Kay2 Zone At the Kay Project in Arizona

AMC.TO

Published on 06/24/2025 at 07:05

Arizona Metals Corp. announced assay results from one drill hole in the Kay2 Zone at the Kay project in Arizona. Drill hole KM-25-181 intersected 29.6 m @ 10.7 g/t AuEq, including 13.6 m @ 17.8 g/t AuEq.

Drill hole 181 is among the most gold-rich holes drilled in the deposit to date, and includes the project's third- highest gold assay from drilling: 35.8 g/t Au (756.2-757.1 m). To date, drilling in the Kay2 Zone has demonstrated dimensions of 100 m along strike and 160 m vertically, with consistently high gold grades throughout. G Mining Services Inc. ("G Mining") has been engaged to audit the MRE and complete the PEA.

The current phase of resource drilling is complete, and the Company has mobilized the two drill rigs to the Kay North Extension target, to be followed by drilling on the North-Central and Western Targets. These areas will be drilled for the first time from newly-permitted and strategically-positioned drill pads, designed to optimize targeting and access. The Company plans 10,000 m of exploration drilling at these targets with holes ranging from 300 m to 900 m in depth.

The true width of mineralization is estimated to be 50% to 99% of reported core width, with an average of 76%. (Fellows, M.L., 1982, Kay Mine massive sulphide deposit: Internal report prepared for Exxon Minerals Company) (Dausinger, N.E., 1983, Phase 1 Drill Program and Evaluation of Gold-Silver Potential, Sugarloaf Peak Project, Quartzsite, Arizona: Report for Westworld Inc.) Qualified Person and Quality Assurance/Quality Control All of Arizona Metals' drill sample assay results have been independently monitored through a quality assurance/quality control ("QA/QC") protocol which includes the insertion of blind standard reference materials and blanks at regular intervals. Mr. Smith supervised the drill program and verified the data disclosed, including sampling, analytical and QA/QC data, underlying the technical information in this news release, including reviewing the reports of ALS, methodologies, results, and all procedures undertaken for quality assurance and quality control in a manner consistent with industry practice, and all matters were consistent and accurate according to his professional judgement.